Legacy reporting rebuilt in Power BI, proven accurate to 100%.
/02THE CHALLENGE
Daylight-saving time logic
/03THE APPROACH
01
Discover & design
We recreated a pilot report using the client's brand design and applied Power BI best practice across query structure, data modeling, and visual formatting.
02
Enable & train
We ran hands-on training for the in-house engineers using real examples from their existing reports, so the knowledge transferred straight into work they already knew.
03
Support & iterate
We stayed on as ad-hoc support through the transition, guiding the engineers on implementation detail and the harder modeling questions as they redesigned the rest.
04
Develop & validate
We built a complex analytical report covering a wide range of time-intelligence calculations, including daylight-saving adjustments and rolling time-window logic, and validated it to 100% against the legacy output.
05
Automate & streamline
We replaced the manual handover, the downloading, copying, and storing of outputs for other reports, with a Power Automate flow that refreshes and transfers data consistently.
/04THE RESULTS
Numbers the auditors trust
Want your legacy reports rebuilt in Power BI and proven accurate?
COMPANY
CONSULTING
ESSENTIAL
PRO
Embedding Power BI in Power Point
TEAM
Power BI User Training


