Legacy reporting rebuilt in Power BI, proven accurate to 100%.
/02THE CHALLENGE
Daylight-saving time logic
/03THE APPROACH
01
Discover & design
We recreated a pilot report using the client's brand design and applied Power BI best practice across query structure, data modeling, and visual formatting.
02
Enable & train
We ran hands-on training for the in-house engineers using real examples from their existing reports, so the knowledge transferred straight into work they already knew.
03
Support & iterate
We stayed on as ad-hoc support through the transition, guiding the engineers on implementation detail and the harder modeling questions as they redesigned the rest.
04
Develop & validate
We built a complex analytical report covering a wide range of time-intelligence calculations, including daylight-saving adjustments and rolling time-window logic, and validated it to 100% against the legacy output.
05
Automate & streamline
We replaced the manual handover, the downloading, copying, and storing of outputs for other reports, with a Power Automate flow that refreshes and transfers data consistently.
/04THE RESULTS
Numbers the auditors trust
Want your legacy reports rebuilt in Power BI and proven accurate?
COMPANY
Embedding Power BI in Power Point
Intro Session

